Deliverable Number Deliverable Title WP number Lead beneficiary Dissemination level Due Date (in months) Download
D1.1 Consortium operating procedures WP1 1 – COBRA Public 3
D1.2 First periodic technical and financial report methodology and progress assessment WP1 1 – COBRA Public 18
D1.3 Final periodic technical and financial report WP1 1 – COBRA Public 36
D1.4 Report on advisory management procedures WP1 1 – COBRA Public 36
D1.5 Project Management Plan WP1 1 – COBRA Public 3
D1.6 First Project Management Plan Review WP1 1 – COBRA Public 18
D1.7 Final Project Management Plan Review WP1 1 – COBRA Public 36
Deliverable Number Deliverable Title WP number Lead beneficiary Dissemination level Due Date (in months) Download
D2.1 Technical Manual on Programming Procedure and Implementation WP2 2 – IDIE Confidential, only for members of the consortium (including the Commission Services) 4
D2.2 CSP and HYSOL Power Block Software WP2 2 – IDIE Confidential, only for members of the consortium tor (including the Commission Services) 12
D2.3 Non-synchronous technologies Validation Report WP2 2 – IDIE Public 12
D2.4 Other synchronous technologies Validation Report WP2 2 – IDIE Public 12
D2.5 Electricity storage system Validation Report WP2 2 – IDIE Public 12
D2.6 Preliminary Energy Mix Determination Report WP2 2 – IDIE Public 14
Deliverable Number Deliverable Title WP number Lead beneficiary Dissemination level Due Date (in months) Download
D3.1 Single tower heliostat field and molten salt parabolic trough performance model report WP3 3 – SBP SONNE GMBH Confidential, only for members of the consortium (including the Commission Services) 7
D3.2 Molten salt parabolic trough Solar Field Validation Report WP3 3 – SBP SONNE GMBH Confidential, only for members of the consortium (including the Commission Services) 9
D3.3 Single tower Solar Field Validation Report WP3 3 – SBP SONNE GMBH Confidential, only for members of the consortium (including the Commission Services) 10
D3.4 Report describing methodology developed for multi- tower heliostat field analysis WP3 3 – SBP SONNE GMBH Confidential, only for members of the consortium (including the Commission Services) 13
D3.5 Multi-tower Solar Field Validation Report WP3 3 – SBP SONNE GMBH Confidential, only for members of the consortium (including the Commission Services) 17
D3.6 Report describing methodology used and results found for multi-tower heliostat field optimization WP3 3 – SBP SONNE GMBH Confidential, only for members of the consortium (including the Commission Services) 18
D3.7 Report describing the most suitable solar field configurations both trough and heliostat for a given site technology & cost and methodology used to identify them WP3 3 – SBP SONNE GMBH Public 18
Deliverable Number Deliverable Title WP number Lead beneficiary Dissemination level Due Date (in months)
D4.1 Requirements specification for the DOME System WP4 4 – TECNALIA Confidential, only for members of the consortium (including the Commission Services) 18
D4.2 DOME Design document. Document with the conceptual design of the DOME controller WP4 4 – TECNALIA Confidential, only for members of the consortium (including the Commission Services) 24
D4.3 Laboratory Test protocol. The test protocol to be carried out for the validation of the control WP4 4 – TECNALIA Confidential, only for members of the consortium tor (including the Commission Services) 24
D4.4 Validation of Results WP4 4 – TECNALIA Confidential,only for members of the consortium (including the Commission Services) 36
Deliverable Number Deliverable Title WP number Lead beneficiary Dissemination level Due Date (in months) Download
D5.1 Preliminary setups for GRIDSOL simulations in the EU electric power system WP5 7 – CESI Confidential, only for members of the consortium tor (including the Commission Services) 4
D5.2 Methodology for GRIDSOL feasibility and adequacy assessment WP5 7 – CESI Public 6
D5.3 Models and scenarios for EU power system market simulations with GRIDSOL integration WP5 7 – CESI Confidential, only for members of the consortium tor (including the Commission Services) 11
D5.4 Assessment of GRIDSOL integration into the EU power system market WP5 7 – CESI Public 16
D5.5 Models and scenarios for EU electric power system simulations with GRIDSOL integration WP5 7 – CESI Confidential, only for members of the consortium tor (including the Commission Services) 13
D5.6 Assessment of GRDISOL integration into the EU electric power system WP5 7 – CESI Public 22
D5.7 WP5 Executive summary WP5 7 – CESI Public 22
Deliverable Number Deliverable Title WP number Lead beneficiary Dissemination level Due Date (in months) Download
D6.1 Isolated electrical system: Data collection WP6 9 – ICCS/NTUA Confidential, only for members of the consortium tor (including the Commission Services) 6
D6.2 Market performances simulations in the Non Interconnected System WP6 9 – ICCS/NTUA Confidential, only for members of the consortium tor (including the Commission Services) 12
D6.3 Assessment of GRIDSOL configuration feasibility in Non-Interconnected Systems WP6 9 – ICCS/NTUA Public 22
D6.4 Assessment of GRIDSOL configuration technical performance adequacy in the non-interconnected systems WP6 9 – ICCS/NTUA Public 22
Deliverable Number Deliverable Title WP number Lead beneficiary Dissemination level Due Date (in months) Download
D7.1 Methodology assessment for Smart Renewable Hubs implementation WP7 5 – DTU Public 36
D7.2 Feasibility of GRIDSOL solutions WP7 5 – DTU Public 36
D7.3 Power System impact and GRIDSOL potentials WP7 5 – DTU Public 36
D7.4 GRIDSOL impact in summary WP7 5 – DTU Public 36
Deliverable Number Deliverable Title WP number Lead beneficiary Dissemination level Due Date (in months) Download
D8.1 IPR management procedures WP8 6 – ETRA Public 6
D8.2 Innovative business models and legal issues WP8 6 – ETRA Public 18
D8.3 Exploitation strategies and Market uptake WP8 6 – ETRA Public 36
D8.4 WP8 Executive Summary WP8 6 – ETRA Public 36
Deliverable Number Deliverable Title WP number Lead beneficiary Dissemination level Due Date (in months) Download
D9.1 Project visual identity guidelines WP9 1 – COBRA Public 1
D9.2 GRIDSOL website, regularly updated WP9 1 – COBRA Public 1
D9.3 Dissemination materials leaflet, poster, info package WP9 1 – COBRA Public 3
D9.4 Communication & dissemination plan WP9 1 – COBRA Public 30
D9.5 Dissemination movie WP9 1 – COBRA Public 10
D9.6 Project Workshops WP9 1 – COBRA Public 25
D9.7 Dissemination final report WP9 1 – COBRA Public 36
D9.8 Dissemination final event WP9 1 – COBRA Public 36

Project Leader

cobra_258